The build, stage by stage

Stages run one after another from the month you choose; a pause before any stage leaves time to save.

An upper floor going up
  1. Documents and a stamp

    01

    Structural evaluation

    A licensed structural engineer inspects the existing house and says what it can carry and what needs reinforcing.

    First guess: 1 month. Used for: add a floor, repair or reinforce.

    Follows the structural design (NSR-10).

  2. A floor plan on a work table

    02

    Designs and licence

    Architectural and structural designs, then the licence application. Building starts once the licence is granted.

    First guess: 3 months. Used for: empty lot, extend at ground level, add a floor.

  3. An empty lot marked with stakes

    03

    Site preparation

    Clearing, setting out the house on the lot with stakes and string, and digging for the foundations.

    First guess: 1 month. Used for: empty lot.

  4. A rebar cage for a column

    04

    Foundations and structure

    Foundations, columns and beams in reinforced concrete, poured to the structural design.

    First guess: 2 months. Used for: empty lot, extend at ground level, add a floor.

    Best outside the wet months: concrete pours and open excavations.

    Follows the structural design (NSR-10).

  5. Hands laying a brick

    05

    Walls

    Brick or block walls between the columns, with the openings for doors and windows.

    First guess: 2 months. Used for: empty lot, extend at ground level, add a floor.

  6. Slab formwork on props

    06

    Slab or roof

    The floor slab for the next storey or the roof, and its waterproofing.

    First guess: 1 month. Used for: empty lot, extend at ground level, add a floor.

    Best outside the wet months: slab pours and roof work.

    Follows the structural design (NSR-10).

  7. Pipes and conduits in a wall

    07

    Plumbing and wiring

    Water, drainage and electrical runs inside the walls and floors, and the connections.

    First guess: 1 month. Used for: empty lot, bare structure to finish, plastered house to finish, extend at ground level, add a floor.

  8. A freshly plastered wall

    08

    Plaster and floor base

    Plaster on the walls and the levelled base for the floors: the house reaches obra gris.

    First guess: 1 month. Used for: empty lot, bare structure to finish, extend at ground level, add a floor, repair or reinforce.

  9. A finished living room

    09

    Finishes

    Floors, tiling, paint, doors, windows, kitchen and bathroom fittings, and the façade.

    First guess: 2 months. Used for: empty lot, bare structure to finish, plastered house to finish, extend at ground level, add a floor, repair or reinforce.

    Best outside the wet months: exterior paint and façade work.

  10. A level, a ruler and a trowel

    10

    Reinforcement

    The reinforcement the structural evaluation asks for, such as jacketed columns or new beams.

    First guess: 2 months. Used for: add a floor, repair or reinforce.

    Follows the structural design (NSR-10).