Plan your house, stage by stage.

List the rooms and see the built area against your lot, place the stages around Cartago’s two wet seasons, check which licence fits and send BJS Construcciones S.A.S. a brief for a technical visit.

A two-storey house under construction
  • 6starting points, from an empty lot to a repair
  • 14room templates with a usual size
  • 10build stages placed on the months
  • 2wet seasons a year in Cartago
A floor plan on a work table

From the lot to the brief

  1. Start and lot

    Choose where you start, from an empty lot to a house that needs a new floor or a repair, and enter the lot.

  2. Rooms

    Add the rooms you need. The app adds walls and circulation and shows the area of each floor against the lot.

  3. Stages

    Place the stages on the months, see which fall in the wet seasons, and leave pauses to save between them.

  4. Permits and budget

    Answer a few questions about the work, tick the documents you have and look at the reference range.

  5. Send the brief

    Send it to BJS Construcciones S.A.S. for a technical visit. The price comes after that visit.

Six ways to start

  • An empty lot marked with stakes

    01 / 06

    Empty lot

    lote vacío

    Build a new house from the ground up.

    List every room of the new house, floor by floor.

  • A bare brick house ready for a second floor

    02 / 06

    Bare structure to finish

    obra negra

    The structure, walls and roof are up; plaster, services and finishes are missing.

    List the rooms of the house you want to finish.

  • A plastered room before finishes

    03 / 06

    Plastered house to finish

    obra gris

    Walls are plastered and the services are in; it needs fittings and finishes.

    List the rooms of the house you want to finish.

  • Hands laying a brick

    04 / 06

    Extend at ground level

    ampliación

    Add rooms beside or behind the house you have.

    List only the new rooms; they go on the ground floor.

  • An upper floor going up

    05 / 06

    Add a floor

    segundo piso

    Build a new floor on top of the house you have.

    List only the rooms of the new floor or floors.

  • A level, a ruler and a trowel

    06 / 06

    Repair or reinforce

    reparación o reforzamiento

    Cracks, damage or a weak structure: start with an evaluation by a licensed structural engineer.

    Rooms are optional: list the ones affected, if you like.

What the planner checks

Three things to settle before the first visit

A plastered room before finishes

Rooms to floor areas

The rooms you list, plus walls and circulation, make the area of each floor; the ground floor is checked against the lot.

Rain over a building site

Stages around the rain

Concrete, slabs, roofs and the façade are best done outside April–May and October–November.

Documents and a stamp

Licence and documents

A few questions point to the likely licence, or to minor repairs that usually need none.

Worked example

A two-floor house on a 7 × 15 m lot

Living and dining, kitchen, guest toilet, laundry, storage, stairs and a 6 m² patio downstairs; a main bedroom, two bedrooms, a bathroom and the stairs upstairs. With 15 % for walls and circulation the ground floor is 46 m² and the upper floor 44,9 m². With the patio the house takes 52 m² of the 105 m² lot.

Starting in January 2027, the foundations and structure fall partly in May, a wet month, and the planner offers to move them. The reference range for a standard finish is $ 159,9 – 216,6 million, not a quote.

Open it in the planner
The example’s stages from January 2027
StageMonths
Designs and licenceJan – Mar 2027
Site preparationApr 2027
Foundations and structureMay – Jun 2027 wet season
WallsJul – Aug 2027
Slab or roofSep 2027
Plumbing and wiringOct 2027
Plaster and floor baseNov 2027
FinishesDec 2027 – Jan 2028

Cartago is in a high seismic hazard zone.

NSR-10 gives Cartago Aa 0,25 and Av 0,25. A new floor over a house, or any reinforcement, starts with a licensed structural engineer.

Building in a seismic zone

Questions

Before you start

All questions
Does the app draw my house?

No. It adds up the rooms you list into floor areas, checks them against the lot and plans the stages. Plans come from an architect.

Is the budget a quote?

No. It is a reference range from proposed bands. BJS Construcciones S.A.S. gives a price after visiting the site.

Do I need a licence?

The Permits section asks a few questions and points to the likely licence, or to minor repairs that usually need none. Planeación confirms it.

Is anything sent automatically?

No. The app has no internet access. You send the brief yourself by email, share it or read it out on a call.

Technical visit

Send BJS your brief

Plan the rooms and the stages, then send the brief from the planner or the app to ask BJS Construcciones S.A.S. for a technical visit. The price comes after the visit.